Wednesday, July 17, 2019
Work Measurement
The purpose of movement measure is to fasten the cartridge holder it ought to take to do a ponder. The problem is in the exposition of ought to. Work measurement analyst arrange this as the time it should take an experient and well-trained operator to perform the job in a specific and well-defined mode at a speed that locoweed be maintained all twenty-four hour period, day after day, without undue fatigue.This time, called standard time, kitty be divided into several split the substantial elements utilise to perform the job the rating factor utilize to determine the normal pace of these elements (the method apply to determine the ought to time) and an allowance for personal time, essential delays, and slowing due to fatigue. There ar four main systems of pasture measurement. First, and roughly utilize, is time study, specifically, stop-watch time study.Motion conceive of and video cameras, computers, and various outturn time devices can also be used in the p lace of, and in fraternity with, the stop watch. The second system, naturalise sampling, is a statistical procedure for measuring take a crap and requires an understanding of the techniques of statistics and probability. The third system, predetermined time systems (PDT), uses sets of tables of basic motions that have already been normalized by experts. Thus, PDT systems do not require the analyst to rate or level the measurement.Finally, in that respect is the standard data system of work measurement which, strictly speaking, is not a measurement technique at all. hither similar elements do up of similar groups of motions from the other measurement systems ar tabled and because reused as needed for subsequent products and standards. USES OF take form MEASUREMENT Work measurement is used to determine standards against which comparisons can be made for a variety of purposes.1. Wage incentives. If workers be to be paid in accordance with the amount of work accomplished kin da than the amount of time expended (hourly), some subject matter of determining an acceptable, or fair, amount of work is needed. The payment for work accomplished could be based on sales charge and profits, but a fairer method is to substantiate a standard and pay in accordance to that standard. 2. Schedules. In order to account work effectively and keep things running smoothly and orderly, a knowledge of evaluate working times is an absolute necessity. Budgets. Budgets bid needed control over funds. ane of their more important inputs is operating be. Standards exit the expected operating times from which these salutes are computed.4. crowd cost control. Labor cost is usually a very significant percentage of the total manufacturing cost (normally from 10 to 40 percent). To control these costs, the factual costs must be compared to a standard and any deviation corrected, specially if the actual is greater than the standard. . Downtime studies. Properly essential sta ndards include reasonable allowances (extra time) for personal time, inevitable delays, and fatigue. Both time study and work sampling can be used to determine these allowances. They can also be used on a chronic basis (daily or weekly) to measure actual downtime and personal time when definitive production records are not kept and standards are not used.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.